Aqua Line BKC To Aarey Full Ride Details All Station Arrival amp Departure











>> YOUR LINK HERE: ___ http://youtube.com/watch?v=-AbJnaY1EJs

Aqua Line BKC To Aarey Full Ride Details| All Station Arrival Departure • • Mumbai Metro 3 Phase 1 Completes First Month and Records Over 6 Lakh Passengers, Boosting Connectivity Across the City. • How to go CSMIA T1 by Metro 2 from BKC ? • How to go Sahar Road by Metro 2 from BKC ? • How to go Marol by Metro 2 from BKC ? • How to go MIDC by Metro 2 from BKC ? • How to go Seepz by Metro 2 from BKC • How to go Bandra Colony by Metro 2 from BKC • How to go Santacruz by Metro 2 from BKC ? • How to go Aarey by Metro 2 from BKC ? • • Arrival at Seepz • Departure from Seepz Metro 3 station • Arrival at MIDC Metro 3 station • Departure from MIDC Metro 3 station • Arrival at Marol Metro 3 station • Departure from Marol Metro 3 station • Arrival at CSMIA T2 Metro 3 station • Departure from CSMIA T2 Metro 3 station • • Arrival at CSMIA T1 Metro 3 station • Departure from CSMIA T1 Metro 3 station • Arrival at Sahar Metro 3 station • Departure from Sahar Metro 3 station • Arrival at Santacruz Metro 3 station • Departure from Santacruz Metro 3 station • • Arrival at Bandra Colony Metro 3 station • Departure from Bandra Colony Metro 3 station • Arrival at Aarey Metro 3 station • Departure BKC Metro 3 station • • #mumbai • #aarey • #bkc • #bandra • #colaba • • The Mumbai Metro-3, also known as the Aqua Line which is the city's first underground Metro service, opened to public on Monday, a day after Prime Minister Narendra Modi flagged off the service between Bandra-Kurla Complex (BKC) and Aarey Colony JVLR. • Mumbai Metro Line 3 spans 33.5 kilometers with only a 12.44-km stretch of it opened for the public so far, came up at a cost exceeding Rs 32,000 crore. There are 10 stations along the route: Aarey, Marol Naka, CSMIA T1 (Terminal 1), MIDC, SEEPZ, Sahar Road, CSMIA T2 (Terminal 2), Vidyanagari, Dharavi, and BKC. Nine stations are underground, while Aarey is the only ground-level station in this stretch • The Mumbai Metro Line 3 will run from 6:30am to 10:30pm on weekdays and from 8:30am to 10:30pm on weekends, with fares ranging from Rs 10 to Rs 50. Commuters can purchase tickets through a dedicated app or at physical counters, and the National Common Mobility Card will be valid across all metro lines by next month. • #metro3 • #mumbai • #mumbaimetro • #underground • #aqualine • #integrated • #metroupdate • #bkc • #aarey • #metro3 • #mumbaiundergraound • #techno • #bkc • #seepz • #marol • #india • Status of metro 3 in Mumbai is Phase 1 is that its opened and functional. • Stations on the metro 3 route in Mumbai in Phase 1 are Aarey Jvlr, Seepz,MIDC, MAROL, CSMIA T2, Sahar, CSMIA T1, Santacruz Metro, Bandra Colony and BKC • Mumbai Metro Line 3 is fully underground Metro with Aarey as at grade. • Mumbai Metro 3 completion date May 2025 • Mumbai Metro Line 3 opening date is 7th October 2024 • Mumbai Metro Line 3 stations in Phase 1 are Aarey Jvlr, Seepz,MIDC, MAROL, CSMIA T2, Sahar, CSMIA T1, Santacruz Metro, Bandra Colony and BKC • Mumbai metro 3 app is metroconnect3 • Mumbai Metro 3 Phase 1 are Aarey Jvlr, Seepz,MIDC, MAROL, CSMIA T2, Sahar, CSMIA T1, Santacruz Metro, Bandra Colony and BKC • Aarey Metro station Line 3 in Phase 1 are Aarey Jvlr, Seepz,MIDC, MAROL, CSMIA T2, Sahar, CSMIA T1, Santacruz Metro, Bandra Colony and BKC • Mumbai Metro Line 3 Phase 2 is under construction. • Mumbai Airport Terminal 2 to Metro station distance is 100 aprx mtr. • Airport Road Metro station to Terminal 2 Mumbai is 100 mtr away. • Line 4 (Green Line) of the Mumbai Metro is an under-construction - from Wadala (Mumbai) to Kasarvadavali (Ghodbunder road, Thane) via Chembur, Bhandup Mulund and Teen Hath Naka • Line 5 (Orange Line) - will connect Thane with Kalyan via Bhiwandi, with 17 stations. The line will be fully elevated except for a 3 km underground section in Bhiwandi. • Line 6 (Pink Line) - connect Lokhandwala Complex with Vikhroli • Line 7 (Red Line) - will connect Bhayander with the Chhatrapati Shivaji Maharaj International Airport with 24 stations • Gold Line 8 - Airport Express Line part of the metro system for the city of Mumbai Navi Mumbai, India. It will serve direct connectivity from CSMIA Airport in Mumbai to NMIA Airport in Navi Mumbai • Red Line 9 (extension) -is an extension of the Red Line from Andheri to CSMIA and Dahisar to Mira Road and it will run on a double-decker bridge • Green Line 10 - Extension of Line 4 (Green Line) - Gaimukh-Shivaji Chowk (Mira Road) corridor , Thane Metro • Green Line 11 - Extension of Line 4 (Green Line) - from Wadala–CSMT • etc and other proposes • Mumbai metro • Atal Setu bridge mumbai or • Mumbai Trans Harbour Sea Link or Mumbai Trans-Harbour Sealink (MTHL) • Airoli katai elevated roads or • Airoli-Katai Tunnel Road • Goregaon Mulund Link Road • Navi Mumbai International Airport (NMIA) • Sewri Worli Elevated Corridor or SWEC • Chheda Nagar Flyover • Dombivli Mankoli Flyover or • Motagaon Mankoli Bridge • Dombivli-Thane Link Road • Bullet Train Mumbai to Ahmedabad or • Mumbai-Ahmedabad Bullet Train Corridor • Mumba Delhi Expressway • Navi Mumbai International Airport • Samruddhi Mahamarg • etc

#############################









Content Report
Youtor.org / YTube video Downloader © 2025

created by www.youtor.org