MONOPILE INSTALLATION FOR UNMANNED GAS PLATFORM











>> YOUR LINK HERE: ___ http://youtube.com/watch?v=5WwFdLc2RSk

In 2017, the CAPE VLT-320 Triple was used to upend and install a 4.7 meter monopile with a length of 40.5 meter, weighting 336 tonnes in a water depth of 26.5 meter in the Dutch sector of the North Sea for the NAM L13-FI platform. • The monopile was upended to vertical position and driven it at 0.2° (well within the 0.5° required tolerance) verticality without any gripper frame or seabed installation frame. • Find more details here: • https://capeholland.com/news/monopile...

#############################









Content Report
Youtor.org / YTube video Downloader © 2025

created by www.youtor.org