Virgin Trains First Class Lancaster to Euston Full Journey 180519











>> YOUR LINK HERE: ___ http://youtube.com/watch?v=AgNMgjHd3OQ

This video is property of Richard Chalklin • 2160p 4K HD! • After spotting at Preston Lancaster, i head to London on Virgin Trains in First Class to catch the last HST'S out of London Paddington. Aboard 390011 to the capital from Lancaster, with stops at Preston, Wigan, Warrington and then direct to Euston. • Class 390 info: • The Class 390 is a type of electric high-speed train operated by Virgin Trains in the United Kingdom. They are electric multiple units using Fiat Ferroviaria's tilting train Pendolino technology and built by Alstom. Fifty-three units were originally built between 2001 and 2004 for operation on the West Coast Main Line (WCML). The 8-car units were all later lengthened to 9 cars, then an additional four trains and also a further 62 cars were built between 2009 and 2012. The trains of the original batch were the last to be assembled at Alstom's Washwood Heath plant, before its closure in 2005. The remaining trains in the fleet were built in Italy. • The Class 390 is one of the fastest domestic electric multiple units operating in Britain, with a design speed of 140 mph (225 km/h); however, limitations to track signalling systems restrict the units to a maximum speed of 125 mph (200 km/h) in service. In September 2006, the Pendolino set a new speed record, completing the 401 miles (645 km) length of the West Coast Main Line from Glasgow Central to London Euston in 3 hours, 55 minutes, beating the 4-hour-14-minute record for the southbound run previously set in 1981 by its ancestor, British Rail's Advanced Passenger Train. The APT retains the ultimate speed record for this route, having completed the northbound journey between London Euston and Glasgow Central in 3 hours 52 minutes in 1984 which included a 5-minute delay due to a signal fault. The fleet is maintained at Longsight TMD • Background: • During 1997, private operator Virgin Rail Group started operating the InterCity West Coast franchise, taking over from state-owned operator British Rail. Virgin had been awarded the franchise having made a commitment to replace the locomotives and rolling stock in use on the route, namely the British Rail Class 86, 87 and 90 electric locomotives and Mark 2 and Mark 3 coaching stock, with brand new tilting trains. Following negotiations with several manufacturers, Virgin placed an order with Alstom/Fiat Ferroviaria to produce the envisioned tilting train, which was known by the name Pendolino and was later designated under TOPS as the Class 390. • The purpose of tilt on the Pendolino was to maintain passenger comfort levels when traversing curves at high speed by reducing the sideways forces on the train's occupants, minimising their tendency to slide across the carriage. The train was designed to be visually impressive: the concept design for the Pendolino was originally produced by industrial design firm Priestman Goode in cooperation with JHL and Start Design and many aspects of the finished product, such as the shaping of its aerodynamic nose and much of the train's interior areas, can be attributed to them. • The concept of deploying tilting trains on the West Coast Main Line was not an original one. During the 1980s and 1990s, British Rail had developed several plans to introduce new trains and pursued the development of the revolutionary, but ultimately unsuccessful, Class 370 Advanced Passenger Train (APT) for a protracted period.[10] Some years after the cancellation of the APT, British Rail had intended to replace the existing fleet of trains on the West Coast Main Line (in conjunction with a planned route modernisation) as part of the InterCity 250 project, but this was cancelled by the government shortly before the Privatisation of British Rail during the late 1990s. • The original Pendolino order was for 54 eight-carriage sets, costing £500 million. As originally planned, a pre-series test train was scheduled to be completed and to be in active testing by July 2000, while the first Pendolino was to enter revenue service during March 2001. • The Pendolinos were intended to run at service speeds of up to 140 mph (225 km/h). Railtrack, therefore, embarked on a modernisation of the West Coast Main Line to allow for the faster line speeds. However, the programme ran into serious difficulties. By its end, it was almost four times over-budget, had been delayed by a number of years, and had not improved the infrastructure as much as had been planned. Consequently, and in a manner reminiscent of the introduction of the InterCity 225, the lack of signalling upgrades resulted in the maximum line speed being set at 125 mph (200 km/h). Although the Pendolino's in-service top speed is well below British Rail's hopes for the APT, which was to reach up to 155 mph (249 km/h), it does match the maximum speed of 125 mph (200 km/h) for the APT in passenger service (although one APT set reached 162 mph (261 km/h) in testing). • #train #trains #virgin

#############################









Content Report
Youtor.org / YTube video Downloader © 2025

created by www.youtor.org