Software Engineering Numerical LOC FP COCOMO Software Engineering Numerical UGC NET PYQs
>> YOUR LINK HERE: ___ http://youtube.com/watch?v=DPqRNAWLbAY
All Software Engineering Numerical of UGC NET PYQs. LOC, FP Function Point,COCOMO of Software Engineering Numerical UGC NET PYQs • Complete Software Engineering Playlist : • • Software Engineering • join telegram channel • https://t.me/unifystudy • • Q1. A software company needs to develop a project that is estimated as 1000 function points and is planning to use JAVA as the programming language whose approximate lines of code per function point is accepted as 50. Considering a = 1.4 as multiplicative factor,b = 1.0 as exponention factor for the basic COCOMO effort equation and c = 3.0 as multiplicative factor, d = 0.33 as exponention factor for the basic COCOMO duration equation, approximately how long does the project take to complete • • Q2.The number of function points of a proposed system is calculated as 500. Suppose that the system is planned to be developed in Java and the LOC/FP ratio of Java is 50. Estimate the effort (E) required to complete the project using the effort formula of basic COCOMO given below : E = a(KLOC)b Assume that the values of a and b are 2.5 and 1.0 respectively.
#############################
