Reeving the Block
YOUR LINK HERE:
http://youtube.com/watch?v=G68JnDjOMzk
Local 7 Ironworkers and Hallamore Crane Operations Crew reeve the block of a Demag AC 600-ton telescoping crane from left to right with 24 mm CASAR cable and 1,804 feet of line on the main winch. • • Working as a team they thread the cable on a brisk April dawn in preparation for a 200-ton trip and lift of a 120 foot long bridge tower section in Chelsea, MA. • • Shot exclusively with the Canon 5D DSLR in HD Video with a Canon 17mm lens. • • Camera and Edit by Stephen SetteDucati • http://www.setteducati.com • • ©2010 - EarthRock Hill
#############################
