Kilnbridge Maidenhead Station Demolition and Structural Alterations
>> YOUR LINK HERE: ___ http://youtube.com/watch?v=LBAYQaj9lTI
The Crossrail Western Route section comprised infrastructure and station enhancements to the existing rail network, undertaken in conjunction with Network Rail. Balfour Beatty Rail appointed Kilnbridge to undertake a key element of the Maidenhead remodelling works - the complete reconstruction of Platform 5 during the 2013 Christmas possession on a full package basis. The project entailed the complete demolition and removal of 200m of Platform 5 (Bourne Branch) and reconstruction to revised levels and curvature. All Platform works were required to be undertaken during back-to-back 57 hour and 70 hour possessions commencing Christmas Eve 2013, with a partial handback to operator First Great Western 57 hours after commencement which required the station and adjoining platform to return to full operation. • To see our full portfolio of projects, visit https://www.kilnbridge.com/projects • For more information on Kilnbridge, visit: • Our website: http://www.kilnbridge.com • Our Facebook: / kilnbridgekcsl • Our Twitter: / kilnbridge • Our LinkedIn: https://bit.ly/2KZqGy1 • Kilnbridge • McDermott House, South Crescent, • Cody Road Business Park, • London, E16 4TL • +44 (0)207 511 1888 • [email protected]
#############################
