Navi Mumbai Metro navimumbaimetro navimumbai
>> YOUR LINK HERE: ___ http://youtube.com/watch?v=MFTlK1_YJ9g
The Navi Mumbai’s first Metro line 1, connecting Belapur and Pendhar, was thrown open for the public at 3 pm on Friday, 17-Nov-2023. The much-awaited elevated Metro line has been under construction for the past 13 years. Though the foundation stone was laid in 2011, the project faced delays due to challenges related to contractors and technical obstacle. The metro services will provide better connectivity within Navi Mumba. • From November 18, the first service between Pendhar to Belapur Terminal and Belapur Terminal to Pendhar will be at 6am, while the last will be at 10 pm. The frequency of the trains will be of 15 minutes. • The metro route between Belapur and Pendhar has 11 stations, with the depot located at Taloja Panchanand. The stations covered are Belapur Terminal, RBI Colony, Belpada, Utsav Chowk, Kendriya Vihar, Kharghar Village, Central Park, Pethpada, Amandoot, Petali-Taloja and Pendhar. • Metro Line 1 – Belapur to Pendhar • – Total Distance – 11.1 kms • – Stations – 11 • – End to end journey time – 18 minutes • – Fare – Rs 10-40 • – Frequency – 15 minutes. • Do follow us by clicking 👉 @lifeinmumbaiofficial • . • . • . • . • #navimumbaimetro #navimumbaimetro🚄 #metro #metrotrain #metrotrains #navimumbaikars #navimumbai #navimumbaifoodblogger #belapur #kharghar #taloja #lifeinmumbaiofficial
#############################
