Schwertransport Umbau der 600 t Seitenträgerbrücke Kahl Schwerlast











>> YOUR LINK HERE: ___ http://youtube.com/watch?v=PUqYmZOXejM

A 95 meters long and overall 592 tons heavy formation transported a 260 tons heavy transformer from Leer to a distribution station near Conneforde, Germany (   • Heavy Transport - 600 Tons get stuck ...  ). On a parking space the lenght of the High Girder Bridge of the Kahl Heavy Haulage corporation was reduced by 12 meters to reach a lower curve radius. • This is the last part of a threepart series about the transformer transport from Leer to Conneforde: • ◾️ Part 1: Unloading the transformer off the barge:    • Anlanden eines 260-Tonnen-Trafos in L...   • ◾️ Part 2: Departure of the 592 tons heavy Transformer Bridge:    • Heavy Transport - 600 Tons get stuck ...   • ◾️ Part 3: Conversion of the Transformer Bridge • • Subscribe:    / @hd1080ide   • Facebook:   / hd1080ide   • Twitter: www.twitter.com/HD1080ide

#############################









Content Report
Youtor.org / YTube video Downloader © 2025

created by www.youtor.org