Panama Canal A Glimpse of Gatun Locks Nautilus Live











>> YOUR LINK HERE: ___ http://youtube.com/watch?v=X210yqmPkTQ

This compilation of time lapse videos was captured during the first lock of the Panama Canal transit, the Gatun Lock. The three sections of the lock raised the ship approximately 80 feet to the manmade lake in the center of the canal. • E/V Nautilus is exploring the ocean studying biology, geology, archeology, and more. Watch http://www.nautiluslive.org for live video from the ocean floor. For live dive updates follow along on social media at   / nautiluslive   and   / evnautilus   on Twitter. For more photos from our dives, check out our Instagram @nautiluslive.

#############################









Content Report
Youtor.org / YTube video Downloader © 2025

created by www.youtor.org