HE53 Moisture Analyzer quick start guide 2 Installation











>> YOUR LINK HERE: ___ http://youtube.com/watch?v=YC0Lvo8HOao

Place the instrument on a stable table, avoiding air drafts and then put the instrument together in following order: • • First, open the lid and put the draft shield in place. • • Then, add the sample pan holder. • • Then, add the sample pan handler and then close the lid • • Then connect the power cable. • Finally, level the instrument using the front feet so that the bubble is centered. • You can now switch on the instrument. • Learn more about the HE53 and HE73 moisture analyzers • http://www.mt.com/global/en/home/prod...

#############################









Content Report
Youtor.org / YTube video Downloader © 2025

created by www.youtor.org