Crumpsall prepares for Trafford Park Metrolink Line
>> YOUR LINK HERE: ___ http://youtube.com/watch?v=YDRCEHfo9Ig
In readiness for the new £350million Trafford Park Metrolink line, a 13.5-tonne footbridge was removed from the Crumpsall Metrolink stop. • The removal of the bridge, which was 14-metres-long, 2.5-metres-wide and 2.6-metres-high, represents a significant engineering feat and has been captured by time-lapse footage. The bridge was lifted out by contractors M-Pact Thales using a 220-tonne crane. • --------------------------------------------------------------------------------------------------------------- • Find out more about the Trafforrd Park Metrolink Line: • http://ow.ly/2xyx30hOcRU • -------------------------------------------------------------------------------------------------------------- • Follow us on our social media channels: • Twitter: www.twitter.com/officialtfgm • Instagram: www.instagram/officialtfgm • Facebook: www.facebook.com/officialtfgm
#############################
![](http://youtor.org/essay_main.png)