Tanzania 1200tpd Gold Mineral Processing Plant Xinhai2020











>> YOUR LINK HERE: ___ http://youtube.com/watch?v=gKz6_RwqjW0

This Gold Mineral Processing Plant in Tanzania is the real case from Xinhai. • The Tanzania 1,200t/d gold mineral processing plant was an EPC+M+O project. The ore consisted of sulfide (10.7g/t) and oxide (2.4g/t), with Au being the only valuable element. They achieved a leaching rate of 93.75% and 91.58% respectively through the all-slime cyanidation gold extraction process. • (https://www.xinhaimining.com/cases?yo...) • 1. The All-slime cyanidation process was adopted. • 2.Crushing stage: one open-circuit crushing process; • 3.Grinding and classification stage: one closed-circuit grinding, cyclone classification process; • 4. The separation stage adopted the all-slime cyanidation process was adopted, the gold-bearing carbon entered the desorption electrolysis system to extract gold, smelting gold slime, and the tailings were stacked after the thickening and dewatering. • During the project construction, it took effective steps to address the shortage of material, machinery, tools, and technicians. • As most of the equipment is made of thin steel, it adopted effective and sound measures to avoid the deforming of equipment during lifting and transportation and ensure construction quality. • From the #mine_plant_design to the plant operation, all the things are completed by Xinhai. Xinhai team solve the problems of #gold_processing for clients face to face. • (Other cases:   • Malaysia CNMC 700TPD Gold Project | X...  ) • ------------------------------------------------------------------------------------------------------------------------------------------------------------- • More cases please send email to • E-mail: [email protected] • WhatsApp: +86 185 0316 1314 • Web:https://www.xinhaimining.com/case?you...

#############################









Content Report
Youtor.org / YTube video Downloader © 2025

created by www.youtor.org