Kit E34 Back to Boat Building











>> YOUR LINK HERE: ___ http://youtube.com/watch?v=hh6uzx92j1w

With our shade troubles behind us, we get back to work building our 50' Schionning kit catamaran, S/V Lynx. We continue epoxy work on the port hull, outboard side of our future sailboat. We also start building the forebeam of the boat. There is a lot of work to go if we are going to get her ready to circumnavigate on an epic sailing journey! • The S/V Lynx Website: • https://www.svlynx.com • 0:00:00-Introduction and shade tarps • 0:01:44-S/V Lynx Logo • 0:01:59-Removing the flam slats from the port outboard canoe • 0:04:42-Peel Ply explanation • 0:05:40-Sanding the inside of the port canoe, inboard side • 0:08:23-Epoxying the first strips back onto the inboard port canoe • 0:10:38-Starting on the forebeam wood planks. • 0:17:41-Continuing epoxying strips back onto the inboard port canoe • 0:24:00-Mountain Biking interlude while epoxy cures. • 0:26:39-Peel ply removal and biscuit repairs. • 0:29:37-Wrap Up Thanks to our Crew, Patrons and Sponsors

#############################









Content Report
Youtor.org / YTube video Downloader © 2025

created by www.youtor.org