ICF New Construction Build Under Slab Rough In Plumbing











>> YOUR LINK HERE: ___ http://youtube.com/watch?v=nSkCtUogdsI

Episode 10: John explains how the rough in plumbing works under the slab as the crew puts in the main sanitary line and plumbs the showers, toilets, vanities, and washer/dryer connection. ICF walls allow up to a 2 pipe to be plumbed right in the wall! The benefits of plumbing and ICF house are covered along with the benefits of plumbing a single sanitary line for under the slab. • Channel overview: John and Leslie take you step by step on the journey of building their new home on Table Rock Lake. The house is an ICF (insulated concrete form) home with suspended garage floor and concrete decks. This all takes place on a sloped lot, where the fun never ends. From septic to backfill headaches, join them on their journey to build a home on their dream lake lot on Table Rock Lake! • John and Leslie have remodeled three homes and provided construction on many more, but this is their first build from the ground up. John worked as an engineer for several years and as an owner’s representative for several multimillion-dollar homes, so he will serve as the general contractor on this project. • Contractors and Suppliers: • Matt Beard Excavating • Rost Concrete Pumping • Tri-Lakes Redimix Concrete • Fox Blocks ICF Forms • FabForm Fast Footer • Area Information: • Table Rock Lake Chamber of Commerce • https://www.visittablerocklake.com • Table Rock Lake Group on Facebook

#############################









Content Report
Youtor.org / YTube video Downloader © 2025

created by www.youtor.org