Symphony in C4H6 OMV Deutschland butadiene film
>> YOUR LINK HERE: ___ http://youtube.com/watch?v=ob_qZma0sFw
The OMV Deutschland GmbH invested about EUR 200 Mio in a new butadiene plant at Burghausen to strengthen its position in the growth market of petrochemicals. Opening of the construction site was in July 2013, completion was in October 2014. So the whole construction took about 15 months. The butadiene plant was integrated into the production line of the refinery at the end of 2014 during the turnaround and was puted into operation after a test phase. • The entire project included the following subprojects, amongst others the plant for butadiene extraction, steam boiler and pipes, extension of the tank farm and liquefied gas loading, as well as the infrastructure of the control systems. • Some facts and figures: • • 750 workmen in peak period • • piping = 1,200 t • • moved soil = 111,190 m3 • • highest column on site = 87 m • • new storage capacity = 7,400 m3 • • concrete = 8,360 m3 • • steel construction= 900 t • • cable trench= 145 km • • number of equipments = 130 • • 2 butadiene tanks each 1,200 m3, 42 metre • • 2 C4 tanks each 2,400 m3, 84 metre • -------------------------------------------------- • --- Note: As of June 13, 2017 Petrol Ofisi A.S. is no longer part of OMV Group. • -------------------------------------------------- • Subscribe to the OMV Channel: / omv • Follow our Blog: http://www.omv.com/blog • Follow us on Twitter: / omv • Follow us on LinkedIn: / omv • Follow us on XING: http://www.xing.com/company/omv • Follow us on Facebook: http://www.omv.com/portal/01/com/face...
#############################


