【ジャンク】Denyo GAW180エンジン溶接機を修理して復活させます。
>> YOUR LINK HERE: ___ http://youtube.com/watch?v=ozGZ1pDO6_M
0:00 • I received a junk engine welder from an iron garbage shop, and the operating time is 1630 hours. • Generally, it is necessary to replace the piston ring etc. in 1000 hours, so we will disassemble and judge the quality of each part. • 0:40 • It contains a mysterious liquid that is not gasoline. • 3:14 • The board is not damaged and there is no puncture of the capacitor, so please make sure it is a good product. • It's a gambling because if the base is broken, it's useless. • 4:44 • A slide hammer was used to remove the rotor. • You can also use a long bolt to remove it. • 5:03 • Remove the stator coil, this part creates AC100v and welding current. • 6:55 • The puller needs to not only apply tension, but also give an impact. • 7:17 • This part generates DC12V. • 8:45 • The valve stem seal is rolling. • 9:38 • Basically, it is maintained at the compression top dead center. • 11:38 • It seems that it will take 3 weeks for the parts to arrive, so the continuation will be the second part. • Thank you for watching. • I got a welder that needs to be repaired. • However, it takes three weeks for the parts to arrive, so it cannot be completed. • It is a work of BGM DOVA-SYNDROME / shimtone. • #Details in the summary section • #Denyo • GAW180 • #restoration
#############################
