Lowrance Elite Ti2 detailed installation
>> YOUR LINK HERE: ___ http://youtube.com/watch?v=whj-J9OrMng
Will Davis from Grift co. talks through the process of fitting two Elite9 Ti2s to his project tinnie. • ๐๐ผ๐งพ๐Timestamps for all the installation steps are listed below ๐๐งพ๐๐ผ • Timestamps: • 1:00 - Unboxing • 3:57 - Disconnecting Battery • 5:07 - Removing Old Sounder • 7:30 - Placement of a New Sounder • 9:58 - Planning wiring Sequence • 11:52 - Drilling holes for cable routing • 13:40 - Routing Transducer Cable • 15:20 - Mounting Brackets to Transducer • 17:48 - Mounting transducer to hull • 17:56 - Connecting Blade fuse to power cable (before I feed the cable through) • 22:03 - Re-wiring the blade fuse so we can fit everything through the routing holes • 22:52 - Connecting power cables to BUS Bar / Switch Panel • 24:25 - Initialising power to the cables • 25:30 - Quick tips for plugging cables into the MFD (Multi Function Display) • 26:47 - Powering up for the first time!
#############################