AWS D11 Prequalification of WPS Scope amp Welding Processes Part1 in Hindi
>> YOUR LINK HERE: ___ http://youtube.com/watch?v=QDE4JtClwls
In this Video Section, AWS D1.1 Prequalification of WPS ( Scope Welding Processes) Part-1 in Hindi. You will get General Idea. About mentioned topic Below. • 1. Scope, 2.Welding Processes • Other Related Videos:- • AWS D1.1 Prequalification of WPS (Preheat and Interpass Temp. prequalified WPSs ) Part-2 in Hindi • • AWS D1.1 Minimum Preheat and Interpas... • AWS D1.1, Fabrication (Scope, Base Metal, Welding Consumables and Electrode) Part-1 in Hindi • • AWS D1.1 Fabrication Scope, Base Meta... • IS 1852 (Scope, Terminology, Nominal Weight, Tolerance Beam, Column Channel) Part-1 in Hindi • • IS 1852 Scope, Terminology, Nominal W... • IS 2062 (Scope, Refer. Terminology, Material, Grades, Manufacture Free f. Defects) Part-1 in Hindi. • • IS 2062 Scope, Refer. Terminology, Ma... • IS 7215 (Scope Built-up Section) Part-1, in Hindi. • • IS 7215 Scope Built-up Section Part... • Basic of Fabrication and Erection of Steel Structures (What is Structure Type) Part-1, in Hindi. • • Fabrication and Erection of Steel Str... • Internal Welding Defects, Types, Causes and Remedies, in Hindi. • • Welding Defects, Types, Causes and Re... • Preparation of surfaces prior to painting (Reference Standards Rust Grade) Part 1, in Hindi. • • Surfaces Preparation/ Blasting prior ... • Paint Application (Paint System Ambient conditions) Part 1, in Hindi. • • Paint Application, Paint System Amb... • IS 800 (Scope and Material) Part-1, in Hindi. • • IS 800 General Material Requirement... • • And more link given in description box of each video. • Thank You
#############################